Inverness Campus Bridge

Architect

Fairhurst

Value

£210,000

Contractor

Morgan Sindall

A cyclist and pedestrian bridge over the A9 was required to link up a multi-million pound education campus in Inverness.

 

The steel bridge over the busy trunk route connects Highlands and Islands Enterprise’s (HIE) Beechwood site on the eastern edge of the city with the Raigmore Estate, near to houses on Ashton Road.

It has been built to improve connections for students attending HIE’s campus which will be home to the University of the Highlands and Islands and Inverness College when it opens.

Longworth was employed by Morgan Sindall to clad the steel framed bridge with a timber structure, and then the final covering of Tecu Gold.

Specification

  • TECU Gold

What our clients say

"Longworth's knowledge, hands-on attitude and wealth of experience allows them to work with the architect and project team to turn complex designs into reality. We commend their positive and cooperative attitude towards design."

Jason Duggan - Architect, Capita Symonds